For Immediate Release
Posted: May 24, 2021

Contact

Jay Levine, Contract Administrator
(603) 419-0665
Eileen P. Meaney, Chief Communications Officer
(603) 271-6495

Nighttime Bridge Work on the Everett Turnpike

Exit 11 southbound off-ramp to be closed during the overnight hours

The New Hampshire Department of Transportation announces that on Tuesday, May 25, 2021, nighttime bridge repairs will begin on the F. E. Everett Turnpike at the Exit 11 southbound ramp bridge over Greeley Street in Merrimack, NH.

Weather permitting, construction operations will require the Exit 11 southbound off-ramp traffic to be detoured to Exit 10, Continental Boulevard. Greeley Street westbound traffic will be temporarily detoured to the Camp Sargent Road- F. E. Everett Turnpike southbound on-ramp. This work, expected to be completed in one evening, will take place during non-commuter hours, from approximately 8:00 pm to 5:00 am. Motorists should remain alert while traveling through the construction zone and obey all message boards and posted signs.

This work is part of the $8 million Central Turnpike Resurfacing Program.  The general contractor is Continental Paving, Inc from Londonderry, NH.